Downstream station:
SHEF ID: MTNO2 Tom Steed Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 1411.00, Top = 1414.00
PRECIP ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(US/Central)
06/22 00:00 0.00 1407.16 74231 0 0 12.65 12.49
06/22 01:00 0.00 1407.16 74231 0 0 12.65 12.49
06/22 02:00 0.00 1407.16 74231 0 0 12.65 12.49
06/22 03:00 0.00 1407.16 74231 0 0 12.65 12.49
06/22 04:00 0.00 1407.16 74231 0 0 12.65 12.49
06/22 05:00 0.00 1407.18 74349 0 0 12.65 12.41
06/22 06:00 0.00 1407.16 74231 0 0 12.65 12.41
06/22 07:00 0.00 1407.16 74231 0 0 12.65 12.41
06/22 08:00 0.00 1407.16 74231 0 0 12.65 12.49
06/22 09:00 0.00 1407.15 74173 0 0 12.81 12.57
06/22 10:00 0.00 1407.16 74231 0 0 13.21 12.89
06/22 11:00 0.00 1407.16 74231 0 0 13.76 13.05
06/22 12:00 0.00 1407.16 74231 0 0 13.37 12.97
06/22 13:00 0.00 1407.16 74231 0 0 13.60 12.97
06/22 14:00 0.00 1407.16 74231 0 0 14.00 13.21
06/22 15:00 0.00 1407.16 74231 0 0 14.08 12.73
06/22 16:00 0.00 1407.16 74231 0 0 13.37 13.37
06/22 17:00 0.00 1407.15 74173 0 0 13.84 12.97
06/22 18:00 0.00 1407.15 74173 0 0 13.92 12.81
06/22 19:00 0.00 1407.14 74114 0 0 13.76 12.65
06/22 20:00 0.00 1407.14 74114 0 0 13.21 12.65
06/22 21:00 0.00 1407.14 74114 0 0 12.73 12.57
06/22 22:00 0.00 1407.14 74114 0 0 12.73 12.57
06/22 23:00 0.00 1407.13 74055 0 0 12.65 12.57