Downstream station:
SHEF ID: MTNO2 Tom Steed Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 1411.00, Top = 1414.00
PRECIP ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(US/Central)
04/24 00:00 0.51 1406.13 68326 34 0 12.65 12.57
04/24 01:00 0.02 1406.14 68382 0 0 12.65 12.49
04/24 02:00 0.02 1406.14 68382 0 0 12.65 12.49
04/24 03:00 0.00 1406.14 68382 68 0 12.65 12.49
04/24 04:00 0.00 1406.14 68382 68 0 12.65 12.49
04/24 05:00 0.00 1406.16 68494 68 0 12.65 12.49
04/24 06:00 0.00 1406.17 68550 68 0 12.65 12.49
04/24 07:00 0.00 1406.17 68550 68 0 12.65 12.41
04/24 08:00 0.00 1406.17 68550 0 0 12.65 12.41
04/24 09:00 0.00 1406.17 68550 0 0 12.81 12.57
04/24 10:00 0.00 1406.17 68550 0 0 13.21 12.89
04/24 11:00 0.00 1406.18 68605 0 0 13.68 12.97
04/24 12:00 0.00 1406.16 68494 0 0 14.08 12.81
04/24 13:00 0.00 1406.15 68438 0 0 13.84 12.73
04/24 14:00 0.00 1406.14 68382 0 0 13.68 12.89
04/24 15:00 0.00 1406.13 68326 0 0 14.16 12.73
04/24 16:00 0.00 1406.12 68270 0 0 13.84 12.73
04/24 17:00 0.00 1406.12 68270 0 0 14.16 12.65
04/24 18:00 0.00 1406.11 68214 0 0 13.68 12.65
04/24 19:00 0.00 1406.11 68214 0 0 13.29 12.65
04/24 20:00 0.00 1406.11 68214 0 0 12.73 12.65
04/24 21:00 0.00 1406.11 68214 0 0 12.73 12.57
04/24 22:00 0.00 1406.11 68214 0 0 12.65 12.57
04/24 23:00 0.00 1406.12 68270 0 0 12.65 12.57