Downstream station:
SHEF ID: MTNO2 Tom Steed Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 1411.00, Top = 1414.00
PRECIP ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(US/Central)
02/24 00:00 0.00 1406.91 72770 0 0 12.57 12.41
02/24 01:00 0.00 1406.91 72770 0 0 12.57 12.33
02/24 02:00 0.00 1406.92 72828 0 0 12.49 12.33
02/24 03:00 0.00 1406.91 72770 0 0 12.49 12.33
02/24 04:00 0.00 1406.92 72828 0 0 12.49 12.33
02/24 05:00 0.00 1406.92 72828 0 0 12.49 12.25
02/24 06:00 ---- ---- ---- 0 0 ---- ----
02/24 07:00 ---- ---- ---- 0 0 ---- ----
02/24 08:00 ---- ---- ---- 0 0 ---- ----
02/24 09:00 ---- ---- ---- 0 0 ---- ----
02/24 10:00 ---- ---- ---- 0 0 ---- ----
02/24 11:00 ---- 1406.91 72770 0 0 ---- ----
02/24 12:00 0.00 1406.91 72770 0 0 13.68 13.21
02/24 13:00 0.00 1406.92 72828 0 0 13.44 13.05
02/24 14:00 0.00 1406.92 72828 0 0 13.92 12.89
02/24 15:00 0.00 1406.91 72770 0 0 14.00 12.81
02/24 16:00 0.00 1406.91 72770 0 0 13.92 12.81
02/24 17:00 0.00 1406.91 72770 0 0 13.92 12.73
02/24 18:00 0.00 1406.91 72770 0 0 13.53 12.73
02/24 19:00 0.00 1406.91 72770 0 0 12.73 12.65
02/24 20:00 0.00 1406.90 72711 0 0 12.65 12.57
02/24 21:00 0.00 1406.90 72711 0 0 12.65 12.49
02/24 22:00 0.00 1406.90 72711 0 0 12.65 12.41
02/24 23:00 0.00 1406.90 72711 0 0 12.57 12.41