Downstream station:
SHEF ID: MTNO2 Tom Steed Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 1411.00, Top = 1414.00
PRECIP ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(US/Central)
09/20 00:00 0.00 1408.86 84271 0 0 12.81 12.57
09/20 01:00 0.00 1408.86 84271 0 0 12.73 12.57
09/20 02:00 0.00 1408.86 84271 0 0 12.73 12.57
09/20 03:00 0.00 1408.86 84271 0 0 12.73 12.57
09/20 04:00 0.00 1408.86 84271 0 0 12.73 12.57
09/20 05:00 0.00 1408.86 84271 0 0 12.73 12.49
09/20 06:00 0.00 1408.86 84271 0 0 12.65 12.49
09/20 07:00 0.00 1408.86 84271 0 0 12.65 12.49
09/20 08:00 0.00 1408.85 84212 0 0 12.65 12.41
09/20 09:00 0.00 1408.85 84212 0 0 13.05 12.57
09/20 10:00 0.00 1408.85 84212 0 0 13.29 13.05
09/20 11:00 0.00 1408.85 84212 0 0 13.60 13.44
09/20 12:00 0.00 1408.86 84271 0 0 14.00 13.37
09/20 13:00 0.00 1408.86 84271 0 0 13.60 13.21
09/20 14:00 0.00 1408.86 84271 0 0 13.29 13.13
09/20 15:00 0.00 1408.86 84271 0 0 13.29 13.21
09/20 16:00 0.00 1408.86 84271 0 0 13.53 13.21
09/20 17:00 0.00 1408.87 84330 0 0 13.21 13.13
09/20 18:00 0.00 1408.87 84330 0 0 13.29 13.21
09/20 19:00 0.00 1408.87 84330 0 0 13.29 13.29
09/20 20:00 0.00 1408.86 84271 0 0 12.89 12.73
09/20 21:00 0.00 1408.86 84271 0 0 12.81 12.65
09/20 22:00 0.00 1408.87 84330 0 0 12.81 12.65
09/20 23:00 0.00 1408.86 84271 0 0 12.81 12.65