Downstream station:
SHEF ID: MTNO2 Tom Steed Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 1411.00, Top = 1414.00
PRECIP ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(US/Central)
06/18 00:00 0.00 1408.79 83860 0 0 12.81 12.65
06/18 01:00 0.00 1408.79 83860 0 0 12.73 12.57
06/18 02:00 0.00 1408.79 83860 0 0 12.73 12.57
06/18 03:00 0.00 1408.79 83860 0 0 12.73 12.57
06/18 04:00 0.00 1408.79 83860 0 0 12.73 12.57
06/18 05:00 0.00 1408.79 83860 0 0 12.73 12.49
06/18 06:00 0.00 1408.79 83860 0 0 12.65 12.49
06/18 07:00 0.00 1408.79 83860 0 0 12.65 12.49
06/18 08:00 0.00 1408.79 83860 0 0 12.81 12.57
06/18 09:00 0.00 1408.78 83801 0 0 13.21 12.73
06/18 10:00 0.00 1408.78 83801 0 0 13.92 13.29
06/18 11:00 0.00 1408.78 83801 0 0 13.53 13.29
06/18 12:00 0.00 1408.78 83801 0 0 13.29 13.21
06/18 13:00 0.00 1408.78 83801 0 0 13.29 13.29
06/18 14:00 0.00 1408.78 83801 0 0 13.37 13.21
06/18 15:00 0.00 1408.78 83801 0 0 13.21 13.29
06/18 16:00 0.00 1408.78 83801 0 0 13.29 13.21
06/18 17:00 0.00 1408.77 83743 0 0 13.37 13.13
06/18 18:00 0.00 1408.77 83743 0 0 13.21 13.13
06/18 19:00 0.00 1408.77 83743 0 0 13.92 13.13
06/18 20:00 0.00 1408.77 83743 0 0 13.13 13.05
06/18 21:00 0.00 1408.77 83743 0 0 12.89 12.73
06/18 22:00 0.00 1408.76 83684 0 0 12.81 12.65
06/18 23:00 ---- ---- ---- ---- ---- ---- ----