Downstream station:
SHEF ID: MTNO2 Tom Steed Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 1411.00, Top = 1414.00
PRECIP ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(US/Central)
06/15 00:00 0.00 1408.86 84271 0 0 12.81 12.65
06/15 01:00 0.00 1408.86 84271 0 0 12.81 12.57
06/15 02:00 0.00 1408.86 84271 0 0 12.73 12.57
06/15 03:00 0.00 1408.86 84271 0 0 12.73 12.57
06/15 04:00 0.00 1408.86 84271 0 0 12.73 12.57
06/15 05:00 0.00 1408.85 84212 0 0 12.73 12.49
06/15 06:00 0.00 1408.86 84271 0 0 12.65 12.49
06/15 07:00 0.00 1408.85 84212 0 0 12.65 12.49
06/15 08:00 0.00 1408.85 84212 0 0 12.81 12.57
06/15 09:00 0.00 1408.85 84212 0 0 13.21 12.73
06/15 10:00 0.00 1408.85 84212 0 0 13.84 13.21
06/15 11:00 0.00 1408.86 84271 0 0 13.37 13.21
06/15 12:00 0.00 1408.85 84212 0 0 13.21 13.21
06/15 13:00 0.00 1408.86 84271 0 0 13.21 13.21
06/15 14:00 0.00 1408.86 84271 0 0 13.29 13.13
06/15 15:00 0.00 1408.85 84212 0 0 13.29 13.53
06/15 16:00 0.00 1408.85 84212 0 0 13.68 13.13
06/15 17:00 0.00 1408.85 84212 0 0 13.29 13.13
06/15 18:00 0.00 1408.85 84212 0 0 13.29 13.05
06/15 19:00 0.00 1408.85 84212 0 0 13.84 13.05
06/15 20:00 0.00 1408.85 84212 0 0 13.05 13.05
06/15 21:00 0.00 1408.84 84154 0 0 12.81 12.65
06/15 22:00 0.00 1408.84 84154 0 0 12.81 12.65
06/15 23:00 ---- ---- ---- ---- ---- ---- ----