Downstream station:
SHEF ID: MTNO2 Tom Steed Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 1411.00, Top = 1414.00
PRECIP ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(US/Central)
06/03 00:00 0.00 1408.53 82334 0 0 12.81 12.65
06/03 01:00 0.00 1408.53 82334 0 0 12.81 12.57
06/03 02:00 0.00 1408.53 82334 0 0 12.73 12.57
06/03 03:00 0.00 1408.53 82334 0 0 12.57 12.57
06/03 04:00 0.00 1408.53 82334 0 0 12.73 12.49
06/03 05:00 0.00 1408.53 82334 0 0 12.65 12.41
06/03 06:00 0.00 1408.53 82334 0 0 12.65 12.49
06/03 07:00 0.00 1408.53 82334 0 0 12.81 12.41
06/03 08:00 0.00 1408.53 82334 0 0 13.21 12.65
06/03 09:00 0.00 1408.53 82334 0 0 13.29 12.89
06/03 10:00 0.00 1408.53 82334 0 0 13.13 12.97
06/03 11:00 0.01 1408.53 82334 95 0 13.37 13.13
06/03 12:00 0.00 1408.53 82334 95 0 14.00 13.21
06/03 13:00 0.00 1408.54 82392 95 0 13.44 13.21
06/03 14:00 0.00 1408.54 82392 95 0 13.29 13.29
06/03 15:00 0.00 1408.54 82392 95 0 13.37 13.29
06/03 16:00 0.00 1408.54 82392 0 0 13.37 13.21
06/03 17:00 0.00 1408.55 82451 0 0 13.53 13.21
06/03 18:00 0.00 1408.53 82334 0 0 13.29 13.21
06/03 19:00 0.00 1408.54 82392 0 0 13.92 13.21
06/03 20:00 0.00 1408.53 82334 0 0 12.97 12.97
06/03 21:00 0.00 1408.54 82392 0 0 12.81 12.65
06/03 22:00 0.00 1408.53 82334 0 0 12.81 12.65
06/03 23:00 0.00 1408.53 82334 0 0 12.81 12.65