Downstream station:
SHEF ID: MTNO2 Tom Steed Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 1411.00, Top = 1414.00
PRECIP ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(US/Central)
05/02 00:00 0.00 1408.40 81570 0 0 12.81 12.57
05/02 01:00 0.00 1408.40 81570 0 0 12.81 12.57
05/02 02:00 0.00 1408.41 81629 0 0 12.73 12.57
05/02 03:00 0.00 1408.41 81629 0 0 12.73 12.57
05/02 04:00 0.00 1408.41 81629 0 0 12.73 12.57
05/02 05:00 0.00 1408.41 81629 0 0 12.65 12.49
05/02 06:00 0.00 1408.41 81629 0 0 12.65 12.49
05/02 07:00 0.00 1408.41 81629 0 0 12.65 12.41
05/02 08:00 0.00 1408.41 81629 0 0 12.73 12.41
05/02 09:00 0.00 1408.41 81629 0 0 12.89 12.65
05/02 10:00 0.00 1408.41 81629 0 0 13.44 12.89
05/02 11:00 0.00 1408.41 81629 0 0 13.68 13.29
05/02 12:00 0.00 1408.41 81629 0 0 13.53 13.29
05/02 13:00 0.00 1408.41 81629 0 0 13.37 13.37
05/02 14:00 0.00 1408.41 81629 0 0 13.37 13.68
05/02 15:00 0.00 1408.40 81570 0 0 13.29 13.29
05/02 16:00 0.00 1408.40 81570 0 0 13.29 13.21
05/02 17:00 0.00 1408.40 81570 0 0 13.29 13.29
05/02 18:00 0.00 1408.40 81570 0 0 13.68 13.29
05/02 19:00 0.00 1408.40 81570 0 0 14.08 13.29
05/02 20:00 0.00 1408.41 81629 0 0 13.05 13.21
05/02 21:00 0.00 1408.40 81570 0 0 12.89 12.73
05/02 22:00 0.00 1408.39 81512 0 0 12.81 12.65
05/02 23:00 ---- ---- ---- ---- ---- ---- ----