MLBA4: Mulberry River at Mulberry, AR

                                SHEF ID:       MLBA4     Mulberry River near Mulberry. AR
STATION TYPE: Stream Gauge

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/06 00:00 0.00 2.05 497 13.40
06/06 01:00 0.00 2.06 505 13.41
06/06 02:00 0.00 2.06 505 13.42
06/06 03:00 0.00 2.05 497 13.42
06/06 04:00 0.00 2.05 497 13.42
06/06 05:00 0.00 2.04 489 13.42
06/06 06:00 0.00 2.03 481 13.43
06/06 07:00 0.00 2.03 481 13.43
06/06 08:00 0.03 2.03 481 13.43
06/06 09:00 0.33 2.05 497 13.42
06/06 10:00 0.05 2.05 497 13.43
06/06 11:00 0.00 2.05 497 13.43
06/06 12:00 0.00 2.06 505 13.44
06/06 13:00 0.00 2.06 505 13.43
06/06 14:00 0.00 2.06 505 13.42
06/06 15:00 0.00 2.07 513 13.42
06/06 16:00 0.00 2.07 513 13.42
06/06 17:00 0.00 2.07 513 13.42
06/06 18:00 0.00 2.08 521 13.41
06/06 19:00 0.00 2.09 529 13.39
06/06 20:00 0.00 2.10 538 13.39
06/06 21:00 0.00 2.11 546 13.40
06/06 22:00 0.00 2.12 555 13.39
06/06 23:00 0.00 2.12 555 13.41
Data processed at Sat 07Jun2025 04:40 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
MULB.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
MULB.Stage.Inst.1Hour.0.Ccp-Rev
MULB.Flow.Inst.1Hour.0.Ccp-Rev
MULB.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.