MLBA4: Mulberry River at Mulberry, AR

                                SHEF ID:       MLBA4     Mulberry River near Mulberry. AR
STATION TYPE: Stream Gauge

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/01 00:00 0.00 3.00 1113 13.47
06/01 01:00 0.00 2.98 1101 13.47
06/01 02:00 0.00 2.95 1083 13.49
06/01 03:00 0.00 2.94 1077 13.49
06/01 04:00 0.00 2.92 1065 13.50
06/01 05:00 0.01 2.91 1059 13.50
06/01 06:00 0.06 2.90 1053 13.50
06/01 07:00 0.01 2.88 1041 13.51
06/01 08:00 0.01 2.86 1030 13.50
06/01 09:00 0.00 2.85 1024 13.50
06/01 10:00 0.00 2.84 1018 13.50
06/01 11:00 0.00 2.84 1018 13.49
06/01 12:00 0.00 2.84 1018 13.47
06/01 13:00 0.00 2.84 1018 13.47
06/01 14:00 0.00 2.83 1011 13.46
06/01 15:00 0.00 2.81 998 13.45
06/01 16:00 0.00 2.81 998 13.45
06/01 17:00 0.00 2.80 992 13.43
06/01 18:00 0.00 2.79 985 13.42
06/01 19:00 0.00 2.77 972 13.42
06/01 20:00 0.00 2.77 972 13.41
06/01 21:00 0.00 2.74 953 13.42
06/01 22:00 0.00 2.74 953 13.42
06/01 23:00 0.00 2.73 947 13.44
Data processed at Mon 02Jun2025 04:40 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
MULB.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
MULB.Stage.Inst.1Hour.0.Ccp-Rev
MULB.Flow.Inst.1Hour.0.Ccp-Rev
MULB.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.