MLBA4: Mulberry River at Mulberry, AR

                                SHEF ID:       MLBA4     Mulberry River near Mulberry. AR
STATION TYPE: Stream Gauge

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/29 00:00 0.00 4.95 2754 13.48
05/29 01:00 0.00 4.89 2690 13.48
05/29 02:00 0.00 4.83 2625 13.49
05/29 03:00 0.00 4.79 2581 13.49
05/29 04:00 0.00 4.75 2539 13.49
05/29 05:00 0.00 4.70 2486 13.51
05/29 06:00 0.00 4.66 2444 13.51
05/29 07:00 0.00 4.62 2402 13.51
05/29 08:00 0.00 4.58 2361 13.51
05/29 09:00 0.00 4.54 2320 13.50
05/29 10:00 0.00 4.51 2290 13.49
05/29 11:00 0.00 4.47 2249 13.49
05/29 12:00 0.00 4.45 2229 13.47
05/29 13:00 0.00 4.43 2209 13.47
05/29 14:00 0.00 4.39 2170 13.46
05/29 15:00 0.00 4.38 2160 13.46
05/29 16:00 0.00 4.34 2121 13.45
05/29 17:00 0.00 4.31 2092 13.45
05/29 18:00 0.00 4.26 2044 13.45
05/29 19:00 0.00 4.23 2015 13.45
05/29 20:00 0.00 4.20 1987 13.44
05/29 21:00 0.00 4.18 1968 13.45
05/29 22:00 0.00 4.15 1940 13.45
05/29 23:00 0.00 4.11 1903 13.47
Data processed at Fri 30May2025 04:40 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
MULB.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
MULB.Stage.Inst.1Hour.0.Ccp-Rev
MULB.Flow.Inst.1Hour.0.Ccp-Rev
MULB.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.