MLBA4: Mulberry River at Mulberry, AR

                                SHEF ID:       MLBA4     Mulberry River near Mulberry. AR
STATION TYPE: Stream Gauge

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
03/29 00:00 0.00 3.95 1757 13.53
03/29 01:00 0.00 3.93 1739 13.56
03/29 02:00 0.00 3.91 1721 13.58
03/29 03:00 0.00 3.89 1702 13.59
03/29 04:00 0.00 3.87 1684 13.59
03/29 05:00 0.00 3.85 1666 13.59
03/29 06:00 0.00 3.83 1648 13.60
03/29 07:00 0.00 3.82 1639 13.61
03/29 08:00 0.00 3.79 1613 13.62
03/29 09:00 0.00 3.78 1604 13.60
03/29 10:00 0.00 3.76 1587 13.58
03/29 11:00 0.00 3.75 1578 13.53
03/29 12:00 0.00 3.74 1570 13.51
03/29 13:00 0.00 3.72 1553 13.49
03/29 14:00 0.00 3.71 1544 13.49
03/29 15:00 0.00 3.70 1536 13.47
03/29 16:00 0.00 3.68 1519 13.45
03/29 17:00 0.00 3.67 1511 13.45
03/29 18:00 0.00 3.65 1494 13.45
03/29 19:00 0.00 3.63 1478 13.47
03/29 20:00 0.00 3.62 1470 13.47
03/29 21:00 0.00 3.60 1453 13.48
03/29 22:00 0.00 3.58 1437 13.49
03/29 23:00 ---- ---- ---- ----
Data processed at Sat 30Mar2024 04:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
MULB.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
MULB.Stage.Inst.1Hour.0.Ccp-Rev
MULB.Flow.Inst.1Hour.0.Ccp-Rev
MULB.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.