Upstream stations:
Downstream station:SHEF ID: HMMO2 Washita River near Hammon, OK STATION TYPE: Regulating: Stage = 22.00, Flow = 2449 PRECIP STAGE RIV-FLOW BAT-LOAD in ft cfs volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 11/29 00:00 0.00 7.42 8 12.41 11/29 01:00 0.00 7.41 8 12.33 11/29 02:00 0.00 7.42 8 12.33 11/29 03:00 0.00 7.42 8 12.33 11/29 04:00 0.00 7.42 8 12.25 11/29 05:00 0.00 7.42 8 12.25 11/29 06:00 0.00 7.43 9 12.25 11/29 07:00 0.00 7.43 9 12.17 11/29 08:00 0.00 7.44 9 12.17 11/29 09:00 0.00 7.43 9 12.49 11/29 10:00 0.00 7.43 9 13.13 11/29 11:00 0.00 7.42 8 13.05 11/29 12:00 0.00 7.42 8 13.05 11/29 13:00 0.00 7.42 8 12.97 11/29 14:00 0.00 7.42 8 13.05 11/29 15:00 0.00 7.42 8 13.13 11/29 16:00 0.00 7.42 8 13.21 11/29 17:00 0.00 7.42 8 12.81 11/29 18:00 0.00 7.42 8 12.57 11/29 19:00 0.00 7.42 8 12.57 11/29 20:00 0.00 7.43 9 12.49 11/29 21:00 0.00 7.42 8 12.41 11/29 22:00 0.00 7.42 8 12.41 11/29 23:00 ---- ---- ---- ----