Upstream stations:
Downstream station:SHEF ID: HMMO2 Washita River near Hammon, OK STATION TYPE: Regulating: Stage = 22.00, Flow = 2449 PRECIP STAGE RIV-FLOW BAT-LOAD in ft cfs volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 11/15 00:00 0.00 7.42 8 12.41 11/15 01:00 0.00 7.41 8 12.33 11/15 02:00 0.00 7.41 8 12.33 11/15 03:00 0.00 7.42 8 12.33 11/15 04:00 0.00 7.42 8 12.25 11/15 05:00 0.00 7.43 9 12.25 11/15 06:00 0.00 7.44 9 12.25 11/15 07:00 0.00 7.44 9 12.17 11/15 08:00 0.00 7.44 9 12.25 11/15 09:00 0.00 7.43 9 12.57 11/15 10:00 0.00 7.43 9 13.21 11/15 11:00 0.00 7.43 9 13.05 11/15 12:00 0.00 7.42 8 13.05 11/15 13:00 0.00 7.41 8 12.97 11/15 14:00 0.00 7.41 8 12.97 11/15 15:00 0.00 7.41 8 13.29 11/15 16:00 0.00 7.42 8 13.05 11/15 17:00 0.00 7.42 8 12.65 11/15 18:00 0.00 7.43 9 12.57 11/15 19:00 0.00 7.43 9 12.49 11/15 20:00 0.00 7.43 9 12.49 11/15 21:00 0.00 7.44 9 12.41 11/15 22:00 0.00 7.47 10 12.41 11/15 23:00 ---- ---- ---- ----