Upstream stations:
Downstream station:SHEF ID: HMMO2 Washita River near Hammon, OK STATION TYPE: Regulating: Stage = 22.00, Flow = 2449 PRECIP STAGE RIV-FLOW BAT-LOAD in ft cfs volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/23 00:00 0.00 7.25 6 12.41 09/23 01:00 0.00 7.24 6 12.41 09/23 02:00 0.00 7.24 6 12.41 09/23 03:00 0.00 7.25 6 12.33 09/23 04:00 0.00 7.24 6 12.33 09/23 05:00 0.00 7.25 6 12.33 09/23 06:00 0.00 7.25 6 12.25 09/23 07:00 0.00 7.24 6 12.17 09/23 08:00 0.00 7.24 6 12.17 09/23 09:00 0.00 7.24 6 12.73 09/23 10:00 0.00 7.23 5 13.21 09/23 11:00 0.00 7.24 6 12.97 09/23 12:00 0.00 7.24 6 12.97 09/23 13:00 0.00 7.24 6 12.97 09/23 14:00 0.00 7.23 5 12.97 09/23 15:00 0.00 7.23 5 12.97 09/23 16:00 0.00 7.23 5 12.97 09/23 17:00 0.00 7.23 5 13.13 09/23 18:00 0.00 7.24 6 13.05 09/23 19:00 0.00 7.25 6 12.65 09/23 20:00 0.00 7.25 6 12.49 09/23 21:00 0.00 7.26 6 12.49 09/23 22:00 0.00 7.26 6 12.41 09/23 23:00 ---- ---- ---- ----