Upstream stations:
Downstream station:
SHEF ID: GSVT2 Red River near Gainesville, TX
STATION TYPE:
Regulating: Stage = 25.00, Flow = 68922
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
07/05 00:00 0.00 7.91 513 12.57
07/05 01:00 0.00 7.91 513 12.57
07/05 02:00 0.00 7.91 513 12.57
07/05 03:00 0.00 7.90 510 12.57
07/05 04:00 0.00 7.90 510 12.57
07/05 05:00 0.00 7.91 513 12.57
07/05 06:00 0.00 7.92 517 12.49
07/05 07:00 0.00 7.91 513 12.49
07/05 08:00 0.00 7.89 506 12.57
07/05 09:00 0.00 7.89 506 13.21
07/05 10:00 0.00 7.87 499 13.29
07/05 11:00 0.00 7.88 503 13.29
07/05 12:00 0.00 7.87 499 13.29
07/05 13:00 0.00 7.92 517 13.84
07/05 14:00 0.00 7.87 499 13.68
07/05 15:00 0.00 7.88 503 13.76
07/05 16:00 0.00 7.88 503 13.37
07/05 17:00 0.00 7.88 503 13.21
07/05 18:00 0.00 7.88 503 13.13
07/05 19:00 0.00 7.86 495 13.05
07/05 20:00 0.00 7.84 488 13.05
07/05 21:00 ---- 7.86 495 ----
07/05 22:00 ---- 7.86 495 12.65
07/05 23:00 0.00 7.91 513 12.57