Upstream stations:
Downstream station:
SHEF ID: GSVT2 Red River near Gainesville, TX
STATION TYPE:
Regulating: Stage = 25.00, Flow = 68922
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
06/18 00:00 0.00 9.60 1438 12.57
06/18 01:00 ---- 9.62 1454 ----
06/18 02:00 ---- 9.60 1438 12.57
06/18 03:00 0.00 9.59 1431 12.57
06/18 04:00 0.00 9.58 1423 12.57
06/18 05:00 0.00 9.58 1423 12.49
06/18 06:00 0.00 9.57 1416 12.49
06/18 07:00 0.00 9.57 1416 12.49
06/18 08:00 0.00 9.56 1408 12.65
06/18 09:00 0.00 9.53 1386 13.29
06/18 10:00 0.00 9.47 1342 13.29
06/18 11:00 0.00 9.46 1334 13.37
06/18 12:00 0.00 9.47 1342 13.37
06/18 13:00 0.00 9.45 1327 13.29
06/18 14:00 0.00 9.43 1313 13.29
06/18 15:00 0.00 9.40 1292 14.00
06/18 16:00 0.00 9.41 1299 13.29
06/18 17:00 0.00 9.37 1270 13.21
06/18 18:00 0.00 9.37 1270 13.13
06/18 19:00 0.00 9.35 1257 13.13
06/18 20:00 0.00 9.41 1299 13.13
06/18 21:00 0.00 9.39 1284 12.89
06/18 22:00 0.00 9.38 1277 12.65
06/18 23:00 0.00 9.38 1277 12.57