Upstream stations:
Downstream station:
SHEF ID: GSVT2 Red River near Gainesville, TX
STATION TYPE:
Regulating: Stage = 25.00, Flow = 68922
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
11/19 00:00 0.00 7.65 325 12.49
11/19 01:00 0.00 7.65 325 12.49
11/19 02:00 0.00 7.65 325 12.49
11/19 03:00 0.00 7.64 323 12.41
11/19 04:00 0.00 7.65 325 12.41
11/19 05:00 0.00 7.65 325 12.41
11/19 06:00 0.00 7.64 323 12.41
11/19 07:00 0.00 7.65 325 12.33
11/19 08:00 0.00 7.64 323 12.33
11/19 09:00 0.00 7.64 323 12.89
11/19 10:00 ---- 7.62 317 ----
11/19 11:00 ---- 7.62 317 13.21
11/19 12:00 0.00 7.59 310 13.21
11/19 13:00 0.00 7.60 312 13.29
11/19 14:00 0.00 7.62 317 13.29
11/19 15:00 0.00 7.61 315 13.21
11/19 16:00 0.00 7.62 317 13.13
11/19 17:00 0.00 7.61 315 13.05
11/19 18:00 0.00 7.63 320 12.81
11/19 19:00 0.00 7.65 325 12.65
11/19 20:00 0.00 7.59 310 12.57
11/19 21:00 0.00 7.59 310 12.57
11/19 22:00 0.00 7.57 304 12.57
11/19 23:00 ---- ---- ---- ----