Upstream stations:
Downstream station:
SHEF ID: GSVT2 Red River near Gainesville, TX
STATION TYPE:
Regulating: Stage = 25.00, Flow = 68922
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
10/21 00:00 0.00 8.10 462 12.57
10/21 01:00 0.00 8.09 458 12.57
10/21 02:00 0.00 8.09 458 12.49
10/21 03:00 ---- 8.08 455 ----
10/21 04:00 ---- 8.08 455 12.49
10/21 05:00 0.00 8.08 455 12.49
10/21 06:00 0.00 8.08 455 12.49
10/21 07:00 0.00 8.08 455 12.41
10/21 08:00 0.00 8.07 451 12.41
10/21 09:00 0.00 8.07 451 12.57
10/21 10:00 0.00 8.06 447 13.13
10/21 11:00 0.00 8.05 444 13.21
10/21 12:00 0.00 8.09 458 13.29
10/21 13:00 0.00 8.06 447 13.21
10/21 14:00 0.00 8.09 458 13.21
10/21 15:00 0.00 8.09 458 13.13
10/21 16:00 0.00 8.07 451 13.05
10/21 17:00 0.00 8.08 455 13.05
10/21 18:00 0.00 8.08 455 13.05
10/21 19:00 0.00 8.07 451 12.89
10/21 20:00 0.00 8.05 444 12.65
10/21 21:00 0.00 8.05 444 12.57
10/21 22:00 0.00 8.04 441 12.57
10/21 23:00 0.00 8.04 441 12.57