Upstream stations:
Downstream station:
SHEF ID: GSVT2 Red River near Gainesville, TX
STATION TYPE:
Regulating: Stage = 25.00, Flow = 68922
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
09/09 00:00 0.00 8.11 652 12.57
09/09 01:00 0.00 8.10 648 12.57
09/09 02:00 0.00 8.11 652 12.57
09/09 03:00 0.00 8.11 652 12.57
09/09 04:00 0.00 8.11 652 12.57
09/09 05:00 0.00 8.12 656 12.49
09/09 06:00 0.00 8.12 656 12.49
09/09 07:00 0.00 8.11 652 12.49
09/09 08:00 0.00 8.11 652 12.49
09/09 09:00 0.00 8.12 656 12.89
09/09 10:00 ---- 8.11 652 ----
09/09 11:00 ---- 8.08 639 13.37
09/09 12:00 0.00 8.07 635 13.37
09/09 13:00 0.00 8.06 631 13.37
09/09 14:00 0.00 8.07 635 13.29
09/09 15:00 0.00 8.06 631 13.29
09/09 16:00 0.00 8.06 631 13.21
09/09 17:00 0.00 8.09 644 13.21
09/09 18:00 0.00 8.06 631 13.21
09/09 19:00 0.00 8.09 644 13.13
09/09 20:00 0.00 8.08 639 12.97
09/09 21:00 0.00 8.08 639 12.65
09/09 22:00 0.00 8.07 635 12.57
09/09 23:00 0.00 8.06 631 12.57