Upstream stations:
Downstream station:
SHEF ID: GSVT2 Red River near Gainesville, TX
STATION TYPE:
Regulating: Stage = 25.00, Flow = 68922
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
09/04 00:00 0.00 8.24 710 12.57
09/04 01:00 0.00 8.25 714 12.57
09/04 02:00 0.00 8.24 710 12.57
09/04 03:00 0.00 8.24 710 12.57
09/04 04:00 0.00 8.25 714 12.57
09/04 05:00 0.00 8.24 710 12.57
09/04 06:00 0.00 8.24 710 12.57
09/04 07:00 0.00 8.21 696 12.49
09/04 08:00 0.00 8.24 710 12.49
09/04 09:00 0.00 8.23 705 12.97
09/04 10:00 0.00 8.21 696 13.37
09/04 11:00 0.00 8.20 692 13.29
09/04 12:00 0.00 8.17 678 13.29
09/04 13:00 0.00 8.19 687 13.29
09/04 14:00 0.00 8.22 700 13.29
09/04 15:00 0.00 8.22 700 13.29
09/04 16:00 0.00 8.22 700 13.21
09/04 17:00 0.00 8.21 696 13.21
09/04 18:00 0.00 8.17 678 13.21
09/04 19:00 0.00 8.16 674 13.13
09/04 20:00 0.00 8.19 687 12.97
09/04 21:00 0.00 8.22 700 12.65
09/04 22:00 0.00 8.22 700 12.57
09/04 23:00 0.00 ---- ---- 12.57