Upstream stations:
Downstream station:
SHEF ID: GSVT2 Red River near Gainesville, TX
STATION TYPE:
Regulating: Stage = 25.00, Flow = 68922
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
08/05 00:00 0.00 9.59 1512 12.57
08/05 01:00 0.00 9.53 1467 12.57
08/05 02:00 0.00 9.50 1444 12.57
08/05 03:00 0.00 9.46 1415 12.57
08/05 04:00 0.00 9.42 1386 12.57
08/05 05:00 0.00 9.38 1357 12.57
08/05 06:00 0.00 9.36 1343 12.49
08/05 07:00 0.00 9.33 1322 12.49
08/05 08:00 0.00 9.30 1301 12.57
08/05 09:00 0.00 9.27 1280 13.13
08/05 10:00 ---- 9.21 1240 ----
08/05 11:00 ---- 9.19 1226 13.37
08/05 12:00 0.00 9.18 1220 13.37
08/05 13:00 0.00 9.19 1226 13.53
08/05 14:00 0.00 9.16 1207 13.84
08/05 15:00 0.01 9.14 1194 13.29
08/05 16:00 0.00 9.12 1181 13.37
08/05 17:00 0.00 9.18 1220 13.13
08/05 18:00 0.03 9.16 1207 12.97
08/05 19:00 0.00 9.12 1181 12.97
08/05 20:00 0.00 9.08 1155 12.89
08/05 21:00 0.00 9.11 1174 12.73
08/05 22:00 0.00 9.14 1194 12.57
08/05 23:00 0.00 9.13 1187 12.57