Upstream stations:
Downstream station:
    
SHEF ID:       GSVT2     Red River near Gainesville, TX
STATION TYPE:  
Regulating: Stage =    25.00, Flow =    68922
               PRECIP     STAGE  RIV-FLOW  BAT-LOAD
                   in        ft       cfs      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
07/30 00:00      0.00      9.76      1647     12.57
07/30 01:00      0.00      9.74      1630     12.57
07/30 02:00      0.00      9.73      1622     12.57
07/30 03:00      0.00      9.73      1622     12.57
07/30 04:00      0.00      9.72      1614     12.57
07/30 05:00      0.00      9.71      1606     12.57
07/30 06:00      0.00      9.70      1598     12.57
07/30 07:00      0.00      9.70      1598     12.57
07/30 08:00      0.00      9.69      1590     12.57
07/30 09:00      0.00      9.68      1582     13.13
07/30 10:00      0.00      9.69      1590     13.29
07/30 11:00      0.00      9.69      1590     13.37
07/30 12:00      0.00      9.69      1590     13.29
07/30 13:00      0.00      9.63      1543     13.44
07/30 14:00      0.00      9.64      1551     13.53
07/30 15:00      0.00      9.64      1551     13.44
07/30 16:00      0.00      9.64      1551     13.37
07/30 17:00      0.00      9.66      1567     13.21
07/30 18:00      0.00      9.63      1543     13.13
07/30 19:00      0.00      9.65      1559     13.13
07/30 20:00      0.00      9.65      1559     13.13
07/30 21:00      0.00      9.63      1543     12.81
07/30 22:00      0.00      9.62      1535     12.65
07/30 23:00      0.00      9.57      1497     12.65