GNTO2: Elm Fork Red River HWY 6 nr Granite 5S

                                SHEF ID:       GNTO2     Elm Fk Red Rvr HWY 6 nr Granite
STATION TYPE:
Regulating: Stage = 14.00, Flow = 3000

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
11/11 00:00 0.00 7.44 434 12.93 12.60
11/11 01:00 0.00 7.34 403 12.90 12.57
11/11 02:00 0.00 7.25 377 12.90 12.57
11/11 03:00 0.00 7.15 347 12.87 12.53
11/11 04:00 0.00 7.07 322 12.84 12.50
11/11 05:00 0.00 6.98 296 12.83 12.48
11/11 06:00 0.00 6.91 277 12.80 12.46
11/11 07:00 0.00 6.84 259 12.80 12.44
11/11 08:00 0.00 6.77 242 12.80 12.44
11/11 09:00 0.00 6.71 228 12.86 12.52
11/11 10:00 0.00 6.64 212 13.03 12.66
11/11 11:00 0.00 6.58 192 13.47 12.86
11/11 12:00 0.00 6.53 177 14.03 13.68
11/11 13:00 0.00 6.47 160 13.99 13.36
11/11 14:00 0.00 6.42 147 13.62 13.16
11/11 15:00 0.00 6.38 137 13.65 13.09
11/11 16:00 0.00 6.34 128 13.68 13.05
11/11 17:00 0.00 6.30 119 13.30 13.02
11/11 18:00 0.00 6.28 115 13.08 12.77
11/11 19:00 0.00 6.25 109 13.03 12.71
11/11 20:00 0.00 6.22 104 13.01 12.68
11/11 21:00 0.00 6.20 100 12.99 12.66
11/11 22:00 0.00 6.18 96 12.98 12.64
11/11 23:00 0.00 6.16 93 12.96 12.62
Data processed at Tue 12Nov2024 05:48 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
GRAN.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
GRAN.Stage.Inst.1Hour.0.Ccp-Rev
GRAN.Flow.Inst.1Hour.0.Ccp-Rev
GRAN.Volt-Battery.Inst.1Hour.0.Ccp-Rev
GRAN.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.