Upstream stations:
Downstream station:
SHEF ID: GNTO2 Elm Fk Red Rvr HWY 6 nr Granite
STATION TYPE:
Regulating: Stage = 14.00, Flow = 3000
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
03/14 00:00 0.01 5.08 1 12.81 12.73
03/14 01:00 0.00 5.15 1 12.81 12.65
03/14 03:00 0.00 5.15 1 12.81 12.65
03/14 04:00 0.00 5.15 1 12.73 12.65
03/14 05:00 0.00 5.15 1 12.73 12.65
03/14 06:00 0.00 5.14 1 12.73 12.57
03/14 07:00 0.00 5.15 1 12.73 12.57
03/14 08:00 0.00 5.14 1 12.73 12.57
03/14 09:00 0.00 5.14 1 12.73 12.65
03/14 10:00 0.00 5.15 1 13.92 13.37
03/14 11:00 0.00 5.90 56 13.37 13.37
03/14 12:00 0.00 6.49 153 13.44 13.44
03/14 13:00 0.00 6.74 191 13.44 13.76
03/14 14:00 0.00 6.87 204 13.37 13.44
03/14 15:00 0.00 6.98 216 13.76 13.53
03/14 16:00 0.00 7.02 220 13.92 13.76
03/14 17:00 0.00 7.06 224 13.60 14.00
03/14 18:00 0.00 7.06 224 13.92 13.13
03/14 19:00 0.00 7.05 223 14.08 13.05
03/14 20:00 0.00 7.02 220 12.97 12.89
03/14 21:00 0.00 6.99 217 12.89 12.81
03/14 22:00 0.00 6.95 213 12.89 12.73
03/14 23:00 ---- ---- ---- ---- ----