Upstream stations:
Downstream station:
SHEF ID: GNTO2 Elm Fk Red Rvr HWY 6 nr Granite
STATION TYPE:
Regulating: Stage = 14.00, Flow = 3000
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
02/25 00:00 0.00 5.13 1 12.81 12.65
02/25 01:00 0.00 5.13 1 12.81 12.65
02/25 02:00 0.00 5.13 1 12.73 12.65
02/25 03:00 0.00 5.13 1 12.73 12.65
02/25 04:00 0.00 5.12 1 12.73 12.57
02/25 05:00 0.00 5.13 1 12.73 12.57
02/25 06:00 0.00 5.12 1 12.73 12.57
02/25 07:00 0.00 5.12 1 12.65 12.57
02/25 08:00 0.00 5.13 1 12.89 12.65
02/25 09:00 0.00 5.12 1 13.05 12.89
02/25 10:00 0.00 5.12 1 13.68 13.21
02/25 11:00 0.00 5.12 1 13.60 13.44
02/25 12:00 0.00 5.11 1 14.00 13.53
02/25 13:00 0.00 5.06 1 14.24 13.29
02/25 14:00 0.00 5.09 1 13.44 13.29
02/25 15:00 0.00 5.12 1 13.44 13.29
02/25 16:00 0.00 5.07 1 13.60 13.21
02/25 17:00 0.00 5.07 1 13.29 13.13
02/25 18:00 0.00 5.12 1 13.05 13.05
02/25 19:00 0.00 5.11 1 12.97 12.81
02/25 20:00 0.00 5.12 1 12.89 12.73
02/25 21:00 0.00 5.11 1 12.89 12.73
02/25 22:00 0.00 5.11 1 12.81 12.73
02/25 23:00 0.00 5.11 1 12.81 12.65