Upstream stations:
Downstream station:SHEF ID: FSPO2 Beaver R at Hwy 183 nr Ft Supply STATION TYPE: PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD in ft cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 06/23 00:00 0.00 4.04 8 12.73 12.65 06/23 01:00 0.00 4.04 8 12.73 12.65 06/23 02:00 0.00 4.03 8 12.73 12.65 06/23 03:00 0.00 4.04 8 12.73 12.65 06/23 04:00 0.00 4.03 8 12.73 12.65 06/23 05:00 0.00 4.04 8 12.73 12.57 06/23 06:00 0.00 4.05 8 12.73 12.57 06/23 07:00 0.00 4.05 8 12.73 12.57 06/23 08:00 0.00 4.06 8 12.73 12.65 06/23 09:00 0.00 4.09 9 12.81 12.65 06/23 10:00 0.00 4.08 8 13.21 12.97 06/23 11:00 0.00 4.08 8 13.68 13.13 06/23 12:00 0.00 4.08 8 13.60 13.05 06/23 13:00 0.00 4.06 8 13.13 12.97 06/23 14:00 0.00 4.06 8 13.05 12.89 06/23 15:00 0.00 4.06 8 13.05 12.81 06/23 16:00 0.00 4.06 8 12.89 12.81 06/23 17:00 0.00 4.05 8 12.89 12.81 06/23 18:00 0.00 4.05 8 12.89 12.81 06/23 19:00 0.00 4.04 8 12.89 12.73 06/23 20:00 0.00 4.04 8 12.81 12.73 06/23 21:00 0.00 4.04 8 12.81 12.73 06/23 22:00 0.00 4.04 8 12.81 12.73 06/23 23:00 ---- ---- ---- ---- ----