Upstream stations:
Downstream station:SHEF ID: FSPO2 Beaver R at Hwy 183 nr Ft Supply STATION TYPE: PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD in ft cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 03/07 00:00 0.00 1.71 0 12.49 12.41 03/07 01:00 0.00 1.65 0 12.49 12.41 03/07 02:00 0.00 1.61 0 12.49 12.33 03/07 03:00 0.00 1.59 0 12.49 12.33 03/07 04:00 0.00 1.56 0 12.49 12.33 03/07 05:00 0.00 1.55 0 12.49 12.33 03/07 06:00 0.00 1.51 0 12.49 12.33 03/07 07:00 0.00 1.47 0 12.49 12.33 03/07 08:00 0.00 1.92 0 12.81 12.57 03/07 09:00 0.00 2.38 0 13.53 13.21 03/07 10:00 0.00 2.53 0 14.64 13.53 03/07 11:00 0.00 2.63 0 14.56 13.29 03/07 12:00 0.00 2.72 0 14.56 13.21 03/07 13:00 0.01 2.76 0 14.08 13.05 03/07 14:00 0.02 2.85 0 14.00 12.97 03/07 15:00 0.00 3.08 0 13.92 12.97 03/07 16:00 0.00 3.15 0 13.84 12.89 03/07 17:00 0.00 3.21 0 13.84 12.81 03/07 18:00 0.00 3.13 0 12.89 12.81 03/07 19:00 0.00 2.86 0 12.81 12.73 03/07 20:00 0.00 2.58 0 12.81 12.65 03/07 21:00 0.00 2.36 0 12.81 12.65 03/07 22:00 0.00 2.20 0 12.73 12.65 03/07 23:00 ---- ---- ---- ---- ----