Upstream stations:
Downstream station:SHEF ID: FSPO2 Beaver R at Hwy 183 nr Ft Supply STATION TYPE: PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD in ft cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 11/09 00:00 0.00 2.59 0 12.65 12.57 11/09 01:00 0.00 2.55 0 12.65 12.57 11/09 02:00 0.00 2.49 0 12.65 12.57 11/09 03:00 0.00 2.44 0 12.65 12.57 11/09 04:00 0.00 2.40 0 12.65 12.49 11/09 05:00 0.00 2.31 0 12.65 12.49 11/09 06:00 0.00 2.25 0 12.65 12.49 11/09 07:00 0.00 2.14 0 12.65 12.49 11/09 08:00 0.00 2.49 0 12.73 12.57 11/09 09:00 0.00 2.62 0 13.13 12.97 11/09 10:00 0.00 2.63 0 13.05 12.97 11/09 11:00 0.00 2.80 0 13.05 12.89 11/09 12:00 0.00 2.98 0 14.08 13.05 11/09 13:00 0.00 3.19 0 14.00 12.97 11/09 14:00 0.00 3.31 0 13.60 12.81 11/09 15:00 0.00 3.37 0 13.60 12.81 11/09 16:00 0.00 3.38 0 13.60 12.73 11/09 17:00 0.00 3.25 0 12.81 12.73 11/09 18:00 0.00 3.01 0 12.81 12.65 11/09 19:00 0.00 2.77 0 12.73 12.65 11/09 20:00 0.00 2.59 0 12.73 12.65 11/09 21:00 0.00 2.48 0 12.73 12.57 11/09 22:00 0.00 2.38 0 12.65 12.57 11/09 23:00 ---- ---- ---- ---- ----