Upstream stations:
Downstream station:SHEF ID: FSPO2 Beaver R at Hwy 183 nr Ft Supply STATION TYPE: PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD in ft cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 06/29 00:00 0.00 5.06 26 12.73 12.65 06/29 01:00 0.00 5.07 26 12.73 12.57 06/29 02:00 0.00 5.06 26 12.49 12.57 06/29 03:00 0.00 5.05 25 12.49 12.49 06/29 04:00 0.00 5.05 25 12.57 12.49 06/29 05:00 0.00 5.05 25 12.49 12.41 06/29 06:00 0.00 5.05 25 12.41 12.41 06/29 07:00 0.00 5.05 25 12.41 12.33 06/29 08:00 0.00 5.05 25 12.41 12.33 06/29 09:00 0.00 5.04 25 12.49 12.57 06/29 10:00 0.00 5.04 25 12.73 12.57 06/29 11:00 0.00 5.04 25 12.81 12.65 06/29 12:00 0.00 5.05 25 12.89 12.73 06/29 13:00 0.01 5.04 25 12.81 12.73 06/29 14:00 0.00 5.04 25 13.76 12.81 06/29 15:00 0.00 5.03 25 13.68 12.73 06/29 16:00 0.00 5.04 25 13.29 12.65 06/29 17:00 0.00 5.04 25 13.21 12.65 06/29 18:00 0.00 5.03 25 13.21 12.65 06/29 19:00 0.00 5.03 25 12.73 12.65 06/29 20:00 0.00 5.04 25 12.73 12.57 06/29 21:00 0.00 5.03 25 12.65 12.57 06/29 22:00 0.00 5.03 25 12.65 12.57 06/29 23:00 0.00 5.03 25 12.65 12.57