EMPK1: COTTONWOOD R AT EMPORIA

                                SHEF ID:       EMPK1     COTTONWOOD R AT EMPORIA
STATION TYPE:

STAGE RIV-FLOW BAT-LOAD
ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
04/26 00:00 3.88 678 12.81
04/26 01:00 3.80 648 12.81
04/26 02:00 3.73 622 12.81
04/26 03:00 3.66 596 12.73
04/26 04:00 3.60 575 12.73
04/26 05:00 3.54 552 12.65
04/26 06:00 3.47 527 12.65
04/26 07:00 3.43 512 12.65
04/26 08:00 3.37 491 12.73
04/26 09:00 3.33 477 13.60
04/26 10:00 3.29 464 13.84
04/26 11:00 3.23 444 14.00
04/26 12:00 3.22 441 14.00
04/26 13:00 3.18 428 14.00
04/26 14:00 3.15 418 13.92
04/26 15:00 3.12 409 13.84
04/26 16:00 3.10 403 13.84
04/26 17:00 3.07 393 13.68
04/26 18:00 3.04 384 13.60
04/26 19:00 3.02 378 13.53
04/26 20:00 3.00 372 13.21
04/26 21:00 2.98 366 12.89
04/26 22:00 2.96 361 12.89
04/26 23:00 2.97 364 12.81
Data processed at Sun 27Apr2025 04:36 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CEMP.Stage.Inst.1Hour.0.Ccp-Rev
CEMP.Flow.Inst.1Hour.0.Ccp-Rev
CEMP.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.