Upstream stations:
Downstream station:SHEF ID: ELGK1 CANEY R NR ELGIN, KS STATION TYPE: Regulating: Stage = 25.00, Flow = 33506 PRECIP STAGE RIV-FLOW BAT-LOAD in ft cfs volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 01/28 00:00 0.00 1.70 12 12.65 01/28 01:00 0.00 1.70 12 12.65 01/28 02:00 0.00 1.70 12 12.65 01/28 03:00 0.00 1.70 12 12.65 01/28 04:00 0.00 1.70 12 12.60 01/28 05:00 0.00 1.70 12 12.60 01/28 06:00 0.00 1.70 12 12.60 01/28 07:00 0.00 1.70 12 12.60 01/28 08:00 0.00 1.70 12 12.54 01/28 09:00 0.00 1.70 12 12.54 01/28 10:00 0.00 1.70 12 12.71 01/28 11:00 0.00 1.70 12 13.48 01/28 12:00 0.00 1.70 12 13.71 01/28 13:00 0.00 1.70 12 13.53 01/28 14:00 0.00 1.71 14 13.53 01/28 15:00 0.00 1.70 12 13.53 01/28 16:00 0.00 1.70 12 13.42 01/28 17:00 0.00 1.70 12 13.36 01/28 18:00 0.00 1.70 12 13.30 01/28 19:00 0.00 1.70 12 12.89 01/28 20:00 0.00 1.70 12 12.83 01/28 21:00 0.00 1.70 12 12.77 01/28 22:00 0.00 1.70 12 12.71 01/28 23:00 0.00 1.70 12 12.65