Upstream stations:
Downstream station:SHEF ID: ELGK1 CANEY R NR ELGIN, KS STATION TYPE: Regulating: Stage = 25.00, Flow = 33506 PRECIP STAGE RIV-FLOW BAT-LOAD in ft cfs volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 10/31 00:00 0.00 2.10 153 12.71 10/31 01:00 0.00 2.10 153 12.71 10/31 02:00 0.00 2.10 153 12.65 10/31 03:00 0.00 2.10 153 12.65 10/31 04:00 0.00 2.10 153 12.65 10/31 05:00 0.00 2.11 157 12.65 10/31 06:00 0.00 2.09 149 12.65 10/31 07:00 0.00 2.09 149 12.65 10/31 08:00 0.00 2.09 149 12.65 10/31 09:00 0.00 2.09 149 12.65 10/31 10:00 0.00 2.09 149 12.65 10/31 11:00 0.00 2.09 149 13.30 10/31 12:00 0.00 2.08 145 13.36 10/31 13:00 0.00 2.08 145 13.48 10/31 14:00 0.00 2.09 149 13.53 10/31 15:00 0.00 2.08 145 13.53 10/31 16:00 0.00 2.08 145 13.53 10/31 17:00 0.00 2.08 145 13.53 10/31 18:00 0.00 2.07 140 13.48 10/31 19:00 0.00 2.07 140 13.18 10/31 20:00 0.00 2.07 140 12.89 10/31 21:00 0.00 2.07 140 12.83 10/31 22:00 0.00 2.07 140 12.77 10/31 23:00 0.00 2.07 140 12.71