EAGO2: Mountain Fork Riv, Eagletown,

                                SHEF ID:       EAGO2     Mountain Fork near Eagletown, OK
STATION TYPE: Stream Gauge
Regulating: Stage = 9.00, Flow = 9433

PRECIP STAGE RIV-FLOW WTR-TEMP BAT-LOAD
in ft cfs F volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
09/01 00:00 0.00 0.98 185 74.17 12.81
09/01 01:00 0.00 0.98 185 74.19 12.81
09/01 02:00 0.00 0.97 182 74.19 12.73
09/01 03:00 0.00 0.97 182 74.19 12.73
09/01 04:00 0.00 0.96 180 74.17 12.73
09/01 05:00 0.00 0.95 177 74.08 12.73
09/01 06:00 0.00 0.95 177 74.05 12.73
09/01 07:00 0.01 0.95 177 73.85 12.65
09/01 08:00 0.00 0.95 177 73.58 12.65
09/01 09:00 0.00 0.94 174 73.36 12.73
09/01 10:00 0.01 0.95 177 73.26 12.97
09/01 11:00 0.00 0.94 174 73.26 13.21
09/01 12:00 0.00 0.94 174 73.67 13.44
09/01 13:00 0.00 0.94 174 74.28 13.44
09/01 14:00 0.00 0.93 171 74.95 13.44
09/01 15:00 0.00 0.91 166 75.27 13.29
09/01 16:00 0.00 0.91 166 75.56 13.05
09/01 17:00 0.00 0.91 166 75.67 13.05
09/01 18:00 0.00 0.90 163 75.65 13.13
09/01 19:00 0.00 0.89 161 75.38 13.05
09/01 20:00 0.00 0.89 161 75.06 12.89
09/01 21:00 0.00 0.89 161 74.88 12.89
09/01 22:00 0.00 0.88 158 74.79 12.89
09/01 23:00 0.00 0.89 161 74.80 12.81
Data processed at Tue 02Sep2025 04:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
EAGL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
EAGL.Stage.Inst.1Hour.0.Ccp-Rev
EAGL.Flow.Inst.1Hour.0.Ccp-Rev
EAGL.Temp-Water.Inst.1Hour.0.Ccp-Rev
EAGL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.