EAGO2: Mountain Fork Riv, Eagletown,

                                SHEF ID:       EAGO2     Mountain Fork near Eagletown, OK
STATION TYPE: Stream Gauge
Regulating: Stage = 9.00, Flow = 9433

PRECIP STAGE RIV-FLOW WTR-TEMP BAT-LOAD
in ft cfs F volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
02/01 00:00 0.00 1.74 423 52.38 12.73
02/01 01:00 0.00 1.71 410 52.03 12.73
02/01 02:00 0.00 1.68 398 51.75 12.73
02/01 03:00 0.00 1.65 386 51.42 12.65
02/01 04:00 0.00 1.62 375 51.10 12.65
02/01 05:00 0.00 1.60 367 50.79 12.65
02/01 06:00 0.00 1.57 356 50.52 12.65
02/01 07:00 0.00 1.55 348 50.23 12.65
02/01 08:00 0.00 1.52 337 50.04 12.65
02/01 09:00 0.00 1.50 330 49.98 12.73
02/01 10:00 0.00 1.49 326 50.22 12.89
02/01 11:00 0.00 1.48 323 50.47 13.21
02/01 12:00 0.00 1.45 312 51.10 13.37
02/01 13:00 0.00 1.44 309 51.67 13.68
02/01 14:00 0.00 1.42 302 52.07 13.68
02/01 15:00 0.00 1.40 295 52.47 13.37
02/01 16:00 0.00 1.39 292 52.75 13.29
02/01 17:00 0.00 1.38 289 52.84 13.13
02/01 18:00 0.00 1.36 282 52.86 12.97
02/01 19:00 0.00 1.34 276 52.92 12.89
02/01 20:00 0.00 1.32 269 52.99 12.89
02/01 21:00 0.00 1.31 266 53.08 12.81
02/01 22:00 0.00 1.30 263 53.08 12.81
02/01 23:00 0.00 1.29 260 53.04 12.81
Data processed at Sun 02Feb2025 05:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
EAGL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
EAGL.Stage.Inst.1Hour.0.Ccp-Rev
EAGL.Flow.Inst.1Hour.0.Ccp-Rev
EAGL.Temp-Water.Inst.1Hour.0.Ccp-Rev
EAGL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.