EAGO2: Mountain Fork Riv, Eagletown,

                                SHEF ID:       EAGO2     Mountain Fork near Eagletown, OK
STATION TYPE: Stream Gauge
Regulating: Stage = 9.00, Flow = 9433

PRECIP STAGE RIV-FLOW WTR-TEMP BAT-LOAD
in ft cfs F volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
11/24 00:00 0.00 1.27 290 60.71 12.65
11/24 01:00 0.00 1.23 278 60.44 12.65
11/24 02:00 0.00 1.20 268 60.13 12.65
11/24 03:00 0.00 1.17 259 59.83 12.57
11/24 04:00 0.00 1.15 253 59.56 12.57
11/24 05:00 0.00 1.12 244 59.23 12.57
11/24 06:00 0.00 1.10 238 58.98 12.57
11/24 07:00 0.00 1.08 232 58.71 12.57
11/24 08:00 0.00 1.06 226 58.57 12.57
11/24 09:00 0.00 1.04 221 58.55 12.65
11/24 10:00 0.00 1.03 218 58.68 13.13
11/24 11:00 0.00 1.02 215 58.80 13.37
11/24 12:00 0.00 0.95 197 59.14 13.53
11/24 13:00 0.00 0.94 195 59.58 13.44
11/24 14:00 0.00 0.94 195 59.97 13.53
11/24 15:00 0.00 0.91 188 60.26 13.53
11/24 16:00 0.00 0.92 191 60.48 13.29
11/24 17:00 0.00 0.94 195 60.48 13.05
11/24 18:00 0.00 0.92 191 60.37 12.89
11/24 19:00 0.00 0.92 191 60.26 12.89
11/24 20:00 0.00 0.91 188 60.19 12.81
11/24 21:00 0.00 0.90 185 60.13 12.81
11/24 22:00 0.00 0.89 182 60.19 12.81
11/24 23:00 0.00 0.88 180 60.24 12.73
Data processed at Mon 25Nov2024 05:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
EAGL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
EAGL.Stage.Inst.1Hour.0.Ccp-Rev
EAGL.Flow.Inst.1Hour.0.Ccp-Rev
EAGL.Temp-Water.Inst.1Hour.0.Ccp-Rev
EAGL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.