EAGO2: Mountain Fork Riv, Eagletown,

                                SHEF ID:       EAGO2     Mountain Fork near Eagletown, OK
STATION TYPE: Stream Gauge
Regulating: Stage = 9.00, Flow = 9433

PRECIP STAGE RIV-FLOW WTR-TEMP BAT-LOAD
in ft cfs F volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
11/19 00:00 0.00 2.57 921 63.37 12.57
11/19 01:00 0.00 2.50 872 63.27 12.57
11/19 02:00 0.01 2.42 819 63.18 12.57
11/19 03:00 0.00 2.32 755 63.12 12.49
11/19 04:00 0.00 2.23 701 63.07 12.49
11/19 05:00 0.00 2.15 656 63.00 12.49
11/19 06:00 0.00 2.07 614 62.96 12.49
11/19 07:00 0.00 1.99 574 62.89 12.49
11/19 08:00 0.00 1.92 540 62.89 12.57
11/19 09:00 0.00 1.86 512 62.91 12.65
11/19 10:00 0.00 1.80 485 63.01 12.97
11/19 11:00 0.00 1.74 460 63.18 13.21
11/19 12:00 0.00 1.68 436 63.46 13.37
11/19 13:00 0.00 1.64 420 63.82 13.53
11/19 14:00 0.00 1.60 404 64.29 13.53
11/19 15:00 0.00 1.56 389 64.56 13.37
11/19 16:00 0.00 1.52 375 64.62 13.21
11/19 17:00 0.00 1.48 361 64.60 13.05
11/19 18:00 0.00 1.44 346 64.53 12.97
11/19 19:00 0.00 1.41 336 64.53 12.89
11/19 20:00 0.00 1.38 326 64.47 12.81
11/19 21:00 0.00 1.35 316 64.38 12.81
11/19 22:00 0.00 1.33 309 64.31 12.73
11/19 23:00 0.00 1.30 300 64.18 12.73
Data processed at Wed 20Nov2024 05:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
EAGL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
EAGL.Stage.Inst.1Hour.0.Ccp-Rev
EAGL.Flow.Inst.1Hour.0.Ccp-Rev
EAGL.Temp-Water.Inst.1Hour.0.Ccp-Rev
EAGL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.