EAGO2: Mountain Fork Riv, Eagletown,

                                SHEF ID:       EAGO2     Mountain Fork near Eagletown, OK
STATION TYPE: Stream Gauge
Regulating: Stage = 9.00, Flow = 9433

PRECIP STAGE RIV-FLOW WTR-TEMP BAT-LOAD
in ft cfs F volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
11/16 00:00 0.00 1.91 535 62.24 12.65
11/16 01:00 0.00 1.83 499 62.06 12.65
11/16 02:00 0.00 1.74 460 61.84 12.57
11/16 03:00 0.00 1.67 432 61.66 12.57
11/16 04:00 0.00 1.60 404 61.47 12.57
11/16 05:00 0.00 1.54 382 61.30 12.57
11/16 06:00 0.00 1.49 364 61.16 12.49
11/16 07:00 0.00 1.44 346 61.02 12.49
11/16 08:00 0.00 1.38 326 60.98 12.57
11/16 09:00 0.00 1.35 316 61.16 12.65
11/16 10:00 0.00 1.32 306 61.43 12.97
11/16 11:00 0.00 1.28 294 61.90 13.29
11/16 12:00 0.00 1.23 278 62.33 13.68
11/16 13:00 0.00 1.18 262 62.78 13.60
11/16 14:00 0.00 1.18 262 63.03 13.53
11/16 15:00 0.00 1.16 256 63.25 13.21
11/16 16:00 0.00 1.12 244 63.28 13.21
11/16 17:00 0.00 1.10 238 63.32 13.05
11/16 18:00 0.00 1.08 232 63.21 12.89
11/16 19:00 0.00 1.06 226 63.14 12.89
11/16 20:00 0.00 1.04 221 63.19 12.81
11/16 21:00 0.00 1.01 213 63.28 12.81
11/16 22:00 0.00 1.00 210 63.34 12.73
11/16 23:00 0.00 0.99 207 63.46 12.73
Data processed at Sun 17Nov2024 05:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
EAGL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
EAGL.Stage.Inst.1Hour.0.Ccp-Rev
EAGL.Flow.Inst.1Hour.0.Ccp-Rev
EAGL.Temp-Water.Inst.1Hour.0.Ccp-Rev
EAGL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.