EAGO2: Mountain Fork Riv, Eagletown,

                                SHEF ID:       EAGO2     Mountain Fork near Eagletown, OK
STATION TYPE: Stream Gauge
Regulating: Stage = 9.00, Flow = 9433

PRECIP STAGE RIV-FLOW WTR-TEMP BAT-LOAD
in ft cfs F volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
10/24 00:00 0.00 1.08 232 69.24 12.73
10/24 01:00 0.00 1.06 226 69.17 12.65
10/24 02:00 0.00 1.03 218 69.08 12.65
10/24 03:00 0.00 1.02 215 68.94 12.65
10/24 04:00 0.00 0.99 207 68.61 12.65
10/24 05:00 0.00 0.98 205 68.40 12.65
10/24 06:00 0.00 0.96 200 68.00 12.57
10/24 07:00 0.00 0.95 197 67.68 12.57
10/24 08:00 0.00 0.93 193 67.32 12.57
10/24 09:00 0.00 0.92 191 67.17 12.65
10/24 10:00 0.00 0.91 188 67.14 12.81
10/24 11:00 0.00 0.90 185 67.39 13.05
10/24 12:00 0.00 0.90 185 67.89 13.13
10/24 13:00 0.00 0.89 182 68.43 13.13
10/24 14:00 0.00 0.85 171 68.86 13.37
10/24 15:00 0.00 0.81 161 69.08 13.37
10/24 16:00 0.00 0.82 163 69.22 13.37
10/24 17:00 0.00 0.80 158 69.17 13.29
10/24 18:00 0.00 0.83 166 68.83 12.97
10/24 19:00 0.00 0.81 161 68.41 12.89
10/24 20:00 0.00 0.80 158 68.20 12.89
10/24 21:00 0.00 0.79 156 68.11 12.81
10/24 22:00 0.00 0.79 156 68.07 12.81
10/24 23:00 0.00 0.78 153 68.11 12.73
Data processed at Fri 25Oct2024 04:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
EAGL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
EAGL.Stage.Inst.1Hour.0.Ccp-Rev
EAGL.Flow.Inst.1Hour.0.Ccp-Rev
EAGL.Temp-Water.Inst.1Hour.0.Ccp-Rev
EAGL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.