EAGO2: Mountain Fork Riv, Eagletown,

                                SHEF ID:       EAGO2     Mountain Fork near Eagletown, OK
STATION TYPE: Stream Gauge
Regulating: Stage = 9.00, Flow = 9433

PRECIP STAGE RIV-FLOW WTR-TEMP BAT-LOAD
in ft cfs F volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
10/11 00:00 0.00 2.16 686 69.30 12.65
10/11 01:00 0.00 2.08 645 68.61 12.65
10/11 02:00 0.00 1.98 595 68.14 12.65
10/11 03:00 0.00 1.89 553 67.87 12.65
10/11 04:00 0.00 1.81 517 67.77 12.65
10/11 05:00 0.00 1.72 479 67.71 12.57
10/11 06:00 0.00 1.65 451 67.60 12.57
10/11 07:00 0.00 1.59 428 67.60 12.57
10/11 08:00 0.00 1.52 401 67.60 12.57
10/11 09:00 0.00 1.46 378 67.68 12.65
10/11 10:00 0.00 1.41 360 67.82 12.89
10/11 11:00 0.00 1.36 341 67.95 13.05
10/11 12:00 0.00 1.30 320 68.54 13.21
10/11 13:00 0.00 1.28 313 68.72 13.21
10/11 14:00 0.00 1.23 297 69.26 13.60
10/11 15:00 0.00 1.20 287 69.78 13.44
10/11 16:00 0.00 1.17 278 70.11 13.37
10/11 17:00 0.00 1.13 265 70.34 13.05
10/11 18:00 0.00 1.10 256 70.38 13.05
10/11 19:00 0.00 1.07 247 70.25 12.89
10/11 20:00 0.00 1.04 238 70.14 12.81
10/11 21:00 0.00 1.02 232 70.05 12.81
10/11 22:00 0.00 1.01 229 70.00 12.81
10/11 23:00 0.00 0.99 224 69.96 12.73
Data processed at Sat 12Oct2024 04:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
EAGL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
EAGL.Stage.Inst.1Hour.0.Ccp-Rev
EAGL.Flow.Inst.1Hour.0.Ccp-Rev
EAGL.Temp-Water.Inst.1Hour.0.Ccp-Rev
EAGL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.