EAGO2: Mountain Fork Riv, Eagletown,

                                SHEF ID:       EAGO2     Mountain Fork near Eagletown, OK
STATION TYPE: Stream Gauge
Regulating: Stage = 9.00, Flow = 9433

PRECIP STAGE RIV-FLOW WTR-TEMP BAT-LOAD
in ft cfs F volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
03/15 00:00 0.04 1.41 282 57.18 12.89
03/15 01:00 0.01 1.38 273 57.13 12.81
03/15 02:00 0.16 1.35 264 57.00 12.81
03/15 03:00 0.01 1.32 255 56.79 12.81
03/15 04:00 0.00 1.30 249 56.57 12.81
03/15 05:00 0.06 1.28 243 56.37 12.73
03/15 06:00 0.00 1.26 238 56.23 12.73
03/15 07:00 0.00 1.27 241 56.19 12.73
03/15 08:00 0.00 1.28 243 56.07 12.73
03/15 09:00 0.00 1.30 249 56.01 12.73
03/15 10:00 0.00 1.32 255 56.03 12.73
03/15 11:00 0.00 1.33 258 56.14 12.89
03/15 12:00 0.00 1.34 261 56.35 13.13
03/15 13:00 0.00 1.34 261 56.68 13.44
03/15 14:00 0.00 1.35 264 57.06 13.60
03/15 15:00 0.00 1.34 261 57.33 13.68
03/15 16:00 0.00 1.34 261 57.45 13.37
03/15 17:00 0.00 1.33 258 57.60 13.37
03/15 18:00 0.00 1.32 255 57.72 13.44
03/15 19:00 0.00 1.31 252 57.83 13.37
03/15 20:00 0.00 1.34 261 57.88 13.05
03/15 21:00 0.00 1.70 381 57.92 12.97
03/15 22:00 0.00 2.31 658 58.10 12.89
03/15 23:00 0.00 2.67 885 57.81 12.89
Data processed at Sat 16Mar2024 04:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
EAGL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
EAGL.Stage.Inst.1Hour.0.Ccp-Rev
EAGL.Flow.Inst.1Hour.0.Ccp-Rev
EAGL.Temp-Water.Inst.1Hour.0.Ccp-Rev
EAGL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.