EAGO2: Mountain Fork Riv, Eagletown,

                                SHEF ID:       EAGO2     Mountain Fork near Eagletown, OK
STATION TYPE: Stream Gauge
Regulating: Stage = 9.00, Flow = 9433

PRECIP STAGE RIV-FLOW WTR-TEMP BAT-LOAD
in ft cfs F volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
01/11 00:00 0.00 1.89 508 46.72 12.81
01/11 01:00 0.00 1.81 469 46.58 12.73
01/11 02:00 0.00 1.75 441 46.45 12.73
01/11 03:00 0.00 1.68 410 46.35 12.73
01/11 04:00 0.00 1.63 389 46.22 12.73
01/11 05:00 0.00 1.57 364 46.11 12.65
01/11 06:00 0.00 1.52 344 46.02 12.65
01/11 07:00 0.00 1.48 329 45.95 12.65
01/11 08:00 0.00 1.44 314 45.86 12.65
01/11 09:00 0.00 1.41 303 45.91 12.73
01/11 10:00 0.00 1.37 289 46.00 12.89
01/11 11:00 0.00 1.34 278 46.26 13.05
01/11 12:00 0.00 1.31 268 46.51 13.13
01/11 13:00 0.00 1.28 258 46.71 13.13
01/11 14:00 0.00 1.26 251 46.92 13.13
01/11 15:00 0.00 1.23 242 47.14 13.13
01/11 16:00 0.00 1.21 235 47.32 13.21
01/11 17:00 0.00 1.19 229 47.44 13.05
01/11 18:00 0.00 1.17 223 47.59 12.97
01/11 19:00 0.00 1.16 220 47.70 12.89
01/11 20:00 0.00 1.14 214 47.82 12.81
01/11 21:00 0.73 1.15 217 48.07 12.81
01/11 22:00 0.19 1.28 258 48.65 12.81
01/11 23:00 0.00 1.52 344 49.42 12.81
Data processed at Fri 09Feb2024 03:25 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
EAGL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
EAGL.Stage.Inst.1Hour.0.Ccp-Rev
EAGL.Flow.Inst.1Hour.0.Ccp-Rev
EAGL.Temp-Water.Inst.1Hour.0.Ccp-Rev
EAGL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.