EAGO2: Mountain Fork Riv, Eagletown,

                                SHEF ID:       EAGO2     Mountain Fork near Eagletown, OK
STATION TYPE: Stream Gauge
Regulating: Stage = 9.00, Flow = 9433

PRECIP STAGE RIV-FLOW WTR-TEMP BAT-LOAD
in ft cfs F volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
09/05 00:00 0.00 0.77 145 79.07 12.89
09/05 01:00 0.00 0.77 145 79.05 12.89
09/05 02:00 0.00 0.77 145 79.05 12.89
09/05 03:00 0.00 0.78 148 79.03 12.89
09/05 04:00 0.00 0.78 148 79.02 12.81
09/05 05:00 0.00 0.77 145 79.00 12.81
09/05 06:00 0.00 0.77 145 78.91 12.81
09/05 07:00 0.00 0.78 148 78.85 12.81
09/05 08:00 0.00 0.78 148 78.85 12.81
09/05 09:00 0.00 0.78 148 78.87 12.89
09/05 10:00 0.00 0.77 145 79.02 13.21
09/05 11:00 0.00 0.78 148 79.29 13.44
09/05 12:00 0.00 0.75 140 79.79 13.44
09/05 13:00 0.00 0.75 140 80.67 13.37
09/05 14:00 0.00 0.76 143 81.37 13.37
09/05 15:00 0.00 0.74 137 81.43 13.37
09/05 16:00 0.00 0.73 135 81.50 13.05
09/05 17:00 0.00 0.75 140 81.63 13.05
09/05 18:00 0.00 0.75 140 81.34 13.05
09/05 19:00 0.00 0.77 145 80.89 13.05
09/05 20:00 0.00 1.06 223 80.53 12.97
09/05 21:00 0.00 2.35 823 81.27 12.97
09/05 22:00 0.00 3.18 1523 80.60 12.97
09/05 23:00 ---- ---- ---- ---- ----
Data processed at Wed 06Sep2023 04:04 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
EAGL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
EAGL.Stage.Inst.1Hour.0.Ccp-Rev
EAGL.Flow.Inst.1Hour.0.Ccp-Rev
EAGL.Temp-Water.Inst.1Hour.0.Ccp-Rev
EAGL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.