DVDO2: Red Rr at US 183 bridge nr Davidson 2S

                                SHEF ID:       DVDO2     Red River at US 183 Bridge
STATION TYPE:
Regulating: Stage = 9.00, Flow = 10940

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
10/23 00:00 0.00 4.69 288 12.46 12.14
10/23 01:00 0.00 4.68 286 12.44 12.13
10/23 02:00 0.00 4.68 286 12.42 12.11
10/23 03:00 0.00 4.69 288 12.40 12.10
10/23 04:00 0.00 4.71 291 12.40 12.09
10/23 05:00 0.00 5.26 379 12.38 12.07
10/23 06:00 0.00 5.63 572 12.37 12.06
10/23 07:00 0.00 5.63 572 12.36 12.04
10/23 08:00 0.00 5.61 558 12.35 12.03
10/23 09:00 0.00 5.61 558 12.68 12.03
10/23 10:00 0.00 5.62 565 13.03 12.44
10/23 11:00 0.00 5.63 572 13.11 12.71
10/23 12:00 0.00 5.56 522 13.87 12.82
10/23 13:00 0.00 5.65 586 13.76 13.58
10/23 14:00 0.00 5.29 384 13.74 13.51
10/23 15:00 0.00 4.98 334 13.68 13.45
10/23 16:00 0.00 4.69 288 13.46 13.42
10/23 17:00 0.00 5.64 579 13.42 13.13
10/23 18:00 0.01 5.62 565 13.16 13.05
10/23 19:00 0.00 5.12 357 12.73 12.77
10/23 20:00 0.00 5.06 347 12.46 12.36
10/23 21:00 0.00 5.09 352 12.46 12.14
10/23 22:00 0.00 5.08 350 12.45 12.14
10/23 23:00 0.00 5.07 349 12.44 12.13
Data processed at Tue 24Oct2023 04:10 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.