DVDO2: Red Rr at US 183 bridge nr Davidson 2S
Data processed at Thu 20Apr2023 04:12 GMT
All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice.
Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited.
These data are gathered electronically and, as presented, have not undergone any form of quality control. These data are not guaranteed to be valid or correct.
Go to home page.
Go to station list.
Upstream stations:
Downstream station:Previous Day
Next Day
Current Day
SHEF ID: DVDO2 Red River at US 183 Bridge STATION TYPE: Regulating: Stage = 9.00, Flow = 10940 PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD in ft cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 04/19 00:00 0.00 4.69 286 12.50 12.25 04/19 01:00 0.00 4.69 286 12.50 12.23 04/19 02:00 0.00 4.71 290 12.48 12.23 04/19 03:00 0.00 4.76 299 12.47 12.21 04/19 04:00 0.00 4.76 299 12.47 12.20 04/19 05:00 0.00 4.77 300 12.44 12.18 04/19 06:00 0.00 4.77 300 12.43 12.17 04/19 07:00 0.00 4.77 300 12.40 12.14 04/19 08:00 0.00 4.76 299 13.07 12.13 04/19 09:00 0.00 4.76 299 13.76 12.94 04/19 10:00 0.00 4.70 288 13.91 13.58 04/19 11:00 0.00 4.77 300 13.86 13.65 04/19 12:00 0.00 4.77 300 13.52 13.62 04/19 13:00 0.00 4.73 293 13.35 13.21 04/19 14:00 0.00 4.75 297 13.32 13.16 04/19 15:00 0.00 4.74 295 13.29 13.11 04/19 16:00 0.00 4.74 295 13.32 13.14 04/19 17:00 0.00 4.70 288 13.34 13.12 04/19 18:00 0.00 4.74 295 13.37 13.11 04/19 19:00 0.01 4.73 293 13.34 13.13 04/19 20:00 0.02 4.65 279 13.03 13.10 04/19 21:00 0.00 4.64 277 12.61 12.70 04/19 22:00 0.00 4.65 279 12.53 12.31 04/19 23:00 0.00 4.70 288 12.51 12.27