DVDO2: Red Rr at US 183 bridge nr Davidson 2S
Data processed at Sat 15Apr2023 04:12 GMT
All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice.
Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited.
These data are gathered electronically and, as presented, have not undergone any form of quality control. These data are not guaranteed to be valid or correct.
Go to home page.
Go to station list.
Upstream stations:
Downstream station:Previous Day
Next Day
Current Day
SHEF ID: DVDO2 Red River at US 183 Bridge STATION TYPE: Regulating: Stage = 9.00, Flow = 10940 PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD in ft cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 04/14 00:00 0.00 4.74 295 12.50 12.17 04/14 01:00 0.00 4.81 307 12.48 12.16 04/14 02:00 0.00 4.78 302 12.47 12.14 04/14 03:00 0.00 4.83 310 12.46 12.13 04/14 04:00 0.00 4.83 310 12.44 12.11 04/14 05:00 0.00 4.84 311 12.42 12.08 04/14 06:00 0.00 4.84 311 12.39 12.06 04/14 07:00 0.00 4.85 313 12.35 12.04 04/14 08:00 0.00 4.83 310 12.73 12.00 04/14 09:00 0.00 4.82 308 13.73 12.56 04/14 10:00 0.00 4.85 313 14.01 13.39 04/14 11:00 0.00 4.85 313 13.93 13.69 04/14 12:00 0.00 4.85 313 13.90 13.65 04/14 13:00 0.00 4.84 311 13.49 13.45 04/14 14:00 0.00 4.84 311 13.46 13.17 04/14 15:00 0.00 4.84 311 13.42 13.23 04/14 16:00 0.00 4.78 302 13.42 13.18 04/14 17:00 0.00 4.73 293 13.44 13.17 04/14 18:00 0.00 4.74 295 13.47 13.16 04/14 19:00 0.00 4.81 307 13.36 13.16 04/14 20:00 0.00 4.73 293 13.08 12.98 04/14 21:00 0.00 4.82 308 12.64 12.66 04/14 22:00 0.00 4.81 307 12.53 12.25 04/14 23:00 0.00 4.82 308 12.52 12.20