DVDO2: Red Rr at US 183 bridge nr Davidson 2S
Data processed at Wed 12Apr2023 04:12 GMT
All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice.
Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited.
These data are gathered electronically and, as presented, have not undergone any form of quality control. These data are not guaranteed to be valid or correct.
Go to home page.
Go to station list.
Upstream stations:
Downstream station:Previous Day
Next Day
Current Day
SHEF ID: DVDO2 Red River at US 183 Bridge STATION TYPE: Regulating: Stage = 9.00, Flow = 10940 PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD in ft cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 04/11 00:00 0.00 4.90 321 12.50 12.19 04/11 01:00 0.00 4.90 321 12.48 12.15 04/11 02:00 0.00 4.90 321 12.47 12.14 04/11 03:00 0.00 4.91 322 12.46 12.13 04/11 04:00 0.00 4.91 322 12.44 12.11 04/11 05:00 0.00 4.90 321 12.42 12.08 04/11 06:00 0.00 4.91 322 12.40 12.06 04/11 07:00 0.00 4.90 321 12.36 12.03 04/11 08:00 0.00 4.90 321 12.67 11.99 04/11 09:00 0.00 4.92 324 13.79 12.44 04/11 10:00 0.00 4.90 321 14.06 13.50 04/11 11:00 0.00 4.86 314 14.03 13.72 04/11 12:00 0.00 4.94 327 14.00 13.72 04/11 13:00 0.00 4.92 324 13.57 13.35 04/11 14:00 0.00 4.86 314 13.62 13.32 04/11 15:00 0.00 4.89 319 13.59 13.37 04/11 16:00 0.00 4.84 311 13.59 13.34 04/11 17:00 0.00 4.86 314 13.59 13.32 04/11 18:00 0.00 4.85 313 13.62 13.31 04/11 19:00 0.00 4.86 314 13.42 13.31 04/11 20:00 0.00 4.85 313 13.12 13.06 04/11 21:00 0.00 4.82 308 12.67 12.70 04/11 22:00 0.00 4.81 307 12.53 12.27 04/11 23:00 0.00 4.82 308 12.51 12.19