DVDO2: Red Rr at US 183 bridge nr Davidson 2S
Data processed at Wed 22Mar2023 04:12 GMT
All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice.
Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited.
These data are gathered electronically and, as presented, have not undergone any form of quality control. These data are not guaranteed to be valid or correct.
Go to home page.
Go to station list.
Upstream stations:
Downstream station:Previous Day
Next Day
Current Day
SHEF ID: DVDO2 Red River at US 183 Bridge STATION TYPE: Regulating: Stage = 9.00, Flow = 10940 PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD in ft cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 03/21 00:00 0.00 4.90 321 12.50 12.16 03/21 01:00 0.00 4.91 322 12.48 12.14 03/21 02:00 0.00 4.90 321 12.48 12.13 03/21 03:00 0.00 4.90 321 12.47 12.12 03/21 04:00 0.00 4.91 322 12.45 12.11 03/21 05:00 0.00 4.91 322 12.43 12.08 03/21 06:00 0.00 4.91 322 12.42 12.07 03/21 07:00 0.00 4.91 322 12.37 12.05 03/21 08:00 0.00 4.91 322 12.34 12.02 03/21 09:00 0.00 4.91 322 13.13 11.98 03/21 10:00 0.00 4.92 324 14.18 13.05 03/21 11:00 0.00 4.88 318 14.11 13.78 03/21 12:00 0.00 4.88 318 14.10 13.80 03/21 13:00 0.00 4.87 316 13.65 13.79 03/21 14:00 0.00 4.88 318 13.65 13.42 03/21 15:00 0.00 4.88 318 13.59 13.40 03/21 16:00 0.00 4.89 319 13.55 13.33 03/21 17:00 0.00 4.88 318 13.57 13.30 03/21 18:00 0.00 4.88 318 13.56 13.28 03/21 19:00 0.00 4.88 318 13.51 13.26 03/21 20:00 0.00 4.90 321 13.11 13.11 03/21 21:00 0.00 4.89 319 12.67 12.70 03/21 22:00 0.00 4.89 319 12.53 12.28 03/21 23:00 0.00 4.89 319 12.52 12.19