DVDO2: Red Rr at US 183 bridge nr Davidson 2S
Data processed at Mon 06Mar2023 05:12 GMT
All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice.
Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited.
These data are gathered electronically and, as presented, have not undergone any form of quality control. These data are not guaranteed to be valid or correct.
Go to home page.
Go to station list.
Upstream stations:
Downstream station:Previous Day
Next Day
Current Day
SHEF ID: DVDO2 Red River at US 183 Bridge STATION TYPE: Regulating: Stage = 9.00, Flow = 10940 PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD in ft cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 03/05 00:00 0.00 4.95 329 12.48 12.14 03/05 01:00 0.00 4.95 329 12.45 12.11 03/05 02:00 0.00 4.95 329 12.44 12.10 03/05 03:00 0.00 4.95 329 12.42 12.08 03/05 04:00 0.00 4.96 330 12.40 12.06 03/05 05:00 0.00 4.96 330 12.37 12.04 03/05 06:00 0.00 4.96 330 12.34 12.01 03/05 07:00 0.00 4.96 330 12.31 11.97 03/05 08:00 0.00 4.96 330 13.00 11.94 03/05 09:00 0.00 4.96 330 14.10 12.88 03/05 10:00 0.00 4.95 329 14.06 13.60 03/05 11:00 0.00 4.95 329 14.03 13.75 03/05 12:00 0.00 4.95 329 13.62 13.73 03/05 13:00 0.00 4.95 329 13.56 13.36 03/05 14:00 0.00 4.95 329 13.53 13.29 03/05 15:00 0.00 4.94 327 13.53 13.26 03/05 16:00 0.00 4.93 326 13.50 13.26 03/05 17:00 0.00 4.91 322 13.53 13.22 03/05 18:00 0.00 4.89 319 13.47 13.23 03/05 19:00 0.00 4.91 322 12.93 13.09 03/05 20:00 0.00 4.90 321 12.55 12.53 03/05 21:00 0.00 4.91 322 12.53 12.19 03/05 22:00 0.00 4.92 324 12.51 12.19 03/05 23:00 0.00 4.92 324 12.50 12.17