DVDO2: Red Rr at US 183 bridge nr Davidson 2S
Data processed at Fri 25Nov2022 05:12 GMT
All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice.
Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited.
These data are gathered electronically and, as presented, have not undergone any form of quality control. These data are not guaranteed to be valid or correct.
Go to home page.
Go to station list.
Upstream stations:
Downstream station:Previous Day
Next Day
Current Day
SHEF ID: DVDO2 Red River at US 183 Bridge STATION TYPE: Regulating: Stage = 9.00, Flow = 10940 PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD in ft cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 11/24 00:00 0.00 5.32 388 12.48 12.12 11/24 01:00 0.00 5.31 387 12.47 12.11 11/24 02:00 0.00 5.31 387 12.46 12.10 11/24 03:00 0.00 5.30 385 12.44 12.08 11/24 04:00 0.00 5.30 385 12.41 12.07 11/24 05:00 0.00 5.30 385 12.41 12.06 11/24 06:00 0.00 5.30 385 12.38 12.04 11/24 07:00 0.00 5.32 388 12.36 12.02 11/24 08:00 0.00 5.33 390 12.34 11.99 11/24 09:00 0.00 5.32 388 12.49 11.97 11/24 10:00 0.00 5.32 388 12.85 12.13 11/24 11:00 0.00 5.32 388 13.10 12.50 11/24 12:00 0.00 5.32 388 13.32 12.75 11/24 13:00 0.00 5.32 388 13.53 12.95 11/24 14:00 0.00 5.33 390 13.65 13.15 11/24 15:00 0.00 5.33 390 13.57 13.29 11/24 16:00 0.00 5.32 388 13.48 13.16 11/24 17:00 0.00 5.33 390 13.16 13.10 11/24 18:00 0.00 5.33 390 12.70 12.71 11/24 19:00 0.00 5.33 390 12.50 12.28 11/24 20:00 0.00 5.33 390 12.50 12.14 11/24 21:00 0.00 5.32 388 12.47 12.13 11/24 22:00 0.00 5.33 390 12.47 12.11 11/24 23:00 0.00 5.33 390 12.45 12.10